[ICM-4134] LON to LCY PoP Migration - London, United Kingdom

Scheduled Maintenance Report for Imperva

Completed

The scheduled maintenance has been completed.
Posted Oct 01, 2025 - 09:00 UTC

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Sep 30, 2025 - 23:00 UTC

Scheduled

As part of our commitment to building a future-facing network, Imperva recently launched our Next Generation Architecture in the LCY – London, United Kingdom PoP with improved capacity, connectivity, and services. This PoP is replacing our currently operational PoP in LON – London, United Kingdom . Imperva will be migrating all services and customer traffic from our LON PoP to our LCY PoP, and decommissioning our LON PoP during a scheduled maintenance window which will begin at 30-Sep-2025 23:00 UTC, completing by 01-Oct-2025 09:00 UTC.

For Cloud WAF customers, Imperva will reroute traffic to an unaffected PoP in the region for the duration of the maintenance, with no expected interruption to Cloud WAF services. At the end of the maintenance, traffic will be serviced by the new PoP.

DDoS Protection for Networks customers must ensure that the advertisement of their ranges via an alternate connection such as GRE tunnels or Cross-Connects is in place prior to the start of maintenance to avoid interruption of service. At the end of the maintenance, DDoS Protection traffic will be serviced by the new PoP. If Performance Monitoring is enabled on the connections, you will notice a change in the IP address of the PM servers that are sending ICMP echo messages. This might require you to modify ACL/firewall configurations to allow ICMP traffic from the new IPs. To learn more, see https://docs.imperva.com/bundle/cloud-application-security/page/network-ddos/performance-monitoring.htm
Posted Sep 23, 2025 - 15:16 UTC
This scheduled maintenance affected: EMEA PoPs (London, UK (LCY)).